SEV254 Road and Pavement Engineering
Assessment task 1‐ Road Design
Due date:
Weighting:
Length:
Sunday, 30 August 2020 @8pm AEST
40%
Maximum 25 A4 pages excluding appendices
ASSESSMENT
1
Submission Requirements:
| |
Individual work: This design project is an individual-based assessment. Submission: All students are required to prepare (sequentially organize and properly format) and upload a single PDF file (only one file per assessment item with your Student ID as the file name, for example, 211111111.pdf) on the Assessment 1 submission folder of the unit site |
(CloudDeakin). Note: Softcopy docs (Excel, Word, AutoCAD, Civil 3D, etc.) and multiple files
for one assessment item will not be assessed or referenced.