Unit 7 Surveying, Measuring & Setting-out Assignment Brief
| Qualification | Pearson BTEC Higher Nationals Construction |
| Unit Number | 7 |
| Unit Title | Surveying, Measuring & Setting-out |
| Unit code | H/618/8086 |
| Unit level | 4 |
| Credit value | 15 |
Introduction
Surveying is an essential function in the construction industry, providing services throughout a project’s lifecycle. It begins with collections of initial data on which to base design, then moves on to positional control of the construction process and finally records the ‘as built’ position for comparison with design. There is also a need for monitoring of adverse effects to the surrounding environment. The aspect that binds all of these functions is the control network, which forms the basis for all measurements, and this is a continuous thread throughout the unit.
In practice, surveying functions are divided between the ‘Land Surveyor’ to establish the positional reference and provide topographic data, and the ‘Civil Engineer’ to provide control of construction (setting out) and monitoring. Since there is dependence and commonality between them, this unit covers both contexts equally. In this unit, students will explore the techniques used to set up controls and conduct initial surveys, including communication of results and methods of setting out the built environment. Students will be able to identify and analyse the sources of error and mitigation techniques used in common aspects of surveying.
Learning Outcomes
By the end of this unit, students will be able to:
LO1 Explain the methods and technologies used in surveying for construction
LO2 Undertake a closed levelling and stages of a closed 2D traverse survey to establish station coordinates for horizontal and vertical control
LO3 Apply industry-standard techniques in the collection of survey data and setting out the coordinates of construction elements
LO4 Explore the causes of errors and techniques to improve accuracy in surveying and setting out.
Essential Content
LO1 Explain the methods and technologies used in surveying for construction
Applications of surveying in construction
Topographic (e.g., green field, brown field, green belt)
Cut and fill survey
Control of construction
Monitoring construction
As-built
Current and emerging technologies
Total station
GPS (Global Positioning System) and GNSS (Global Navigation Satellite System)
LiDAR (Light Detection and Ranging)
Drones/UAV (Unmanned Aerial Vehicles)
Laser scanning
Mobile 3D mapping
Photogrammetry
Survey outputs
2D drawings
3D data
Point cloud
Coding conventions
Graphic symbols
Vector outputs
File formats
LO2 Undertake a closed levelling and stages of a closed 2D traverse survey to establish station coordinates for horizontal and vertical control
Types of control points and control networks
First order
Second order
Local and national grid coordinate systems
Types of traverse
Open traverse
Closed traverse
Methods of traverse
Standard methods of horizontal angle and electronic distance measurement
Physical positioning of instruments and targets
Plane table traversing (2D)
Levelling for height
Calculating accuracy of levelling and traverse observations
Calculations to obtain coordinates
Control station accuracy and national/industry standards
Health and safety in surveying and setting out
Assessing site conditions
Existing structures and safety
Working at height
Personal positioning
Working near machinery and mobile plant
LO3 Apply industry-standard techniques in the collection of survey data and setting out the coordinates of construction elements
Holistic view of topographic surveying and setting out
Terminology
Referencing control in data collection and setting out
Topographic and construction elements
Buildings and walls, outlines – footprint
Centre lines of structural elements
Boundary locations from national co-ordinates Road centre lines – kerbs and street furniture
Drainage – utility covers
Hard and soft landscape features
Ground levels, bank tops and bottoms
Positioning and orientating a total station
Free station
Known back sight
Resection
Set orientation
Redundancy and checking
Setting-out and data collection techniques
Obtaining and transferring topographic and setting-out data
Recording topographic detail
Setting-out structures and offsetting lines of structural elements
Horizontal and vertical control of construction
Determining accuracy in setting out
Comparing setting out accuracy with national/industry standards
LO4 Explore the causes of errors and techniques to improve accuracy in surveying and setting out
Errors in surveying and setting out
Collimation error in the horizontal plane
Instrumentation error (e.g., prism constants, reflector heights, atmospheric influences, calibration certification, setup errors, discrete setting out)
Observation error (e.g., two-face observation, pointing and focus, horizontal and vertical collimation)
Human errors (e.g., alignment of levelling staffs and hand- or tripod-mounted prisms, physical setting-out constraints)
Improvement of accuracy
Use of technology to provide checking methods
Testing procedures for instrumentation to be used in setting out and surveying
Using national/industry standards to determine accuracy
Learning Outcomes and Assessment Criteria
| Pass | Merit | Distinction |
| LO1 Explain the methods and technologies used in surveying for construction |
D1 Evaluate the accuracy that may be achieved in a closed traverse survey using different methods and technologies. |
|
| P1 Describe the different types of surveying and their uses for construction.
P2 Explain the technologies used in surveying for construction. |
M1 Analyse the potential benefits of using different technologies in surveying. | |
| LO2 Undertake a closed levelling and stages of a closed 2D traverse survey to establish station coordinates for horizontal and vertical control | ||
| P3 Conduct a closed levelling to establish height control.
P4 Carry out stages of a closed 2D traverse to establish horizontal control. |
M2 Calculate coordinates and heights of control stations from field observations. | |
| LO3 Apply industry-standard techniques in the collection of survey data and setting out the coordinates of construction elements |
D2 Use industry-standard techniques, including software/technology, to improve the accuracy of survey and setting-out data. |
|
| P5 Collect topographic detail using point and line codes.
P6 Undertake setting-out operations for construction elements. |
M3 Analyse the accuracy achieved in setting-out and data collection activities. | |
| LO4 Explore the causes of errors and techniques to improve accuracy in surveying and setting out | ||
| P7 Explain the common causes of errors in setting out and surveying.
P8 Compare the accuracy of setting out data to national/industry standards. |
M4 Assess the impact of surveying and setting-out errors for construction projects. | |